Skip to content

How to safely get a new power point installed in your Warner home

Adding a power point is one of the most common electrical jobs in a home, and in Queensland it is one only a licensed electrician can do. This guide covers what you can plan yourself, what the electrician does and how to get a good result.

Licence REC 135414.7 from 12 Google reviews

Planning a new power point

Why this is a job for a licensed electrician

Under Queensland's Electrical Safety Act 2002, work on fixed wiring, including adding, moving or replacing a power point, must be done by a licensed electrician. Online videos make it look simple, but a wiring mistake can leave a point live when it looks off, or leave the metal case of an appliance live, and the fault may not show until someone gets a shock or a fire starts.

Unlicensed electrical work is illegal in Queensland and can affect your home insurance. The safe and legal path is to plan the job yourself and have a licensed electrician do the work.

Plan where the point goes and what it will run

Start with what you will plug in. A phone charger, lamp or television can share a circuit with other points. A heavy load such as an oven, a large air conditioner, a pool pump or an EV charger needs its own circuit, which means work at the switchboard.

Mark the spot on the wall at the height you want, and think about furniture: a point hidden behind a bed head or a fridge is hard to reach. In kitchens, laundries and bathrooms the Wiring Rules (AS/NZS 3000) control how close a point can be to sinks, basins and showers, so the electrician may suggest a slightly different spot. Outdoor points need a weatherproof rating to suit where they sit.

Choose the type of outlet

Double power points are standard and cost little more than singles. Combination points with USB or USB-C chargers suit bedsides, kitchen benches and home offices. Outdoor and alfresco points need a weatherproof cover rated for the location.

For a home office or an entertainment unit, adding a point is safer than running power boards and double adapters, which are meant for short-term use and are easy to overload.

What the electrician checks before quoting

The electrician looks at the switchboard to see whether the circuit has room for another point and whether it is protected by a safety switch. Under the Wiring Rules, new power point circuits must have safety switch (RCD) protection, so an older board without one may need a safety switch added.

They also look at the cable route. Plasterboard walls with roof space above are usually straightforward. Brick walls, concrete slabs, two-storey homes and walls with no access above take longer. Homes built before 1990 may have asbestos cement sheeting in some walls and eaves, which must not be cut or drilled without the right precautions, so mention it if you know your home has it.

On the day: install and testing

The electrician isolates the circuit at the switchboard and confirms it is dead before work starts. They cut in the mounting box, run the cable from the switchboard or an existing point, connect the active, neutral and earth conductors and fix the outlet. A single point added to an existing circuit is often done within an hour or two.

The new point is then tested for earth continuity, insulation resistance and correct polarity, and the safety switch that protects it is trip tested. In Queensland the electrician gives you a certificate of testing and safety for the work. Keep it with your house papers, as insurers and buyers may ask for it.

Signs an existing power point needs attention

Call an electrician if a point feels warm, has scorch marks, crackles when you plug in or is loose in the wall, or if plugs fall out of it easily. Stop using it until it has been checked.

Tom adds and replaces power points across Warner and the Pine Rivers district, quotes in writing and tests every point before he leaves.

Common questions

Something not covered? Call Tom on 0401 456 987.

Can I install a power point myself in Queensland?

No. In Queensland, adding, moving or replacing a power point is electrical work under the Electrical Safety Act 2002 and must be done by a licensed electrician. Homeowners can plan the job, choose the outlet and clear the area, but must not touch the fixed wiring. Unlicensed work is illegal and can affect your home insurance, so it is worth the call.

How long does it take to install a new power point?

A double power point added to an existing circuit in a plasterboard wall is often finished within an hour or two, including testing. Brick walls, long cable runs, two-storey homes and jobs that need a new circuit or a safety switch at the switchboard take longer. The electrician can give you a better idea once they have seen the wall and the switchboard.

Want Tom to take a look?

Call 0401 456 987 or send the details for a free written quote.

Call Tom on 0401 456 987