Ferny Grove was a claypit and the Wunderlich tile works south of the railway station until its urbanisation in the late 1970s. That makes many of its houses likely to be older than the 1992 rule that made safety switches mandatory in every newly built or extended Queensland home. It matters for air conditioning because wiring a new split system circuit is electrical installation work. Under the Electrical Safety Regulation 2026, a licensed electrician must not do that work in a home whose power points have no approved safety switch unless the job includes fitting one, apart from exceptions such as emergency work. Owners of an unprotected house can choose how far to go: altering one circuit only requires that circuit to gain RCD protection, while replacing the whole board protects every applicable circuit. Tom's pages say the business can upgrade circuits or the switchboard where needed as part of the same job.
The second check is the outdoor unit. Ferny Grove sits in the City of Brisbane, and Brisbane City Council treats air conditioner noise as an offence when it is more than 5 dBA above background between 7am and 10pm, or more than 3 dBA above background between 10pm and 7am, measured at a neighbour's property. The council's first suggestion is to place equipment away from neighbours and from sensitive spots like bedroom windows. On the Zoned Energy Rating Label, outdoor noise is printed in dB(A) beside the stars, so the quieter models can be compared before buying.
The third check applies to the flats and apartments. Under the standard by-laws, changing the external look of a lot needs the body corporate's written approval unless the change is minor, and a lot must not create noise that interferes with others; some schemes have their own registered by-laws instead.
Only then does the unit itself get chosen. Sizing should start from the room, its floor area, walls, insulation and windows, because an undersized unit works harder and an oversized one costs more to buy and run. Pick the size, then compare stars, keeping in mind that Brisbane falls in the hot zone of the label map. After the circuit is connected, the contractor must hand over a certificate of testing and compliance.